Images

February 2018 pre-drill operations

Preparing access ways for Eblana-3 and Eblana-6 wellpads

 

Preparing Eblana-3 and Eblana-6 well pads

Drilling water well

Setting Eblana-3 and Eblana-6 conductor pipes

 

April 2018 drilling operations

Eblana-3 drill 

EBLANA-3 PRELIMINARY TESTING

Pump installation

Fluids from wellhead after shut-in.

 

November 2020 pre-drill operations

Preparing access way and well pad for Eblana-9

 

Setting Eblana-9 conductor pipe, rigging up and testing

 

Spud Eblana-9 and drilling