February 2018 pre-drill operations
Preparing access ways for Eblana-3 and Eblana-6 wellpads
Preparing Eblana-3 and Eblana-6 well pads
Drilling water well
Setting Eblana-3 and Eblana-6 conductor pipes
April 2018 drilling operations
Eblana-3 drill
EBLANA-3 PRELIMINARY TESTING
Pump installation
Fluids from wellhead after shut-in.
November 2020 pre-drill operations
Preparing access way and well pad for Eblana-9
Setting Eblana-9 conductor pipe, rigging up and testing
Spud Eblana-9 and drilling